INSTALLATION

Number of Ground Stations:

Eight (8) GSs distributed around Sulaimaniya

 

Technical Room:

Dual Central Processing Station (CPS)

Automation system (ERIS)

Technical Supervisor (TSUP)

CMS Terminal

 

Operation Room:

Four (4) Controller Working Positions (CWPs)

 

Tower:

One (1) CWP

 

Equipment Room:

One (1) Analysis and Replay Tool (ART) Position

 

Installation period:

28 August – 15 October 2018

INSTALLATION

LOCATIONS

EQUIPMENT

AIR SITUATION DISPLAY