Number of Ground Stations:
Eight (8) GSs distributed around Sulaimaniya
Technical Room:
Dual Central Processing Station (CPS)
Automation system (ERIS)
Technical Supervisor (TSUP)
CMS Terminal
Operation Room:
Four (4) Controller Working Positions (CWPs)
Tower:
One (1) CWP
Equipment Room:
One (1) Analysis and Replay Tool (ART) Position
Installation period:
28 August – 15 October 2018
INSTALLATION

LOCATIONS

EQUIPMENT

AIR SITUATION DISPLAY

